Past Performance


FIELD iNSTALLATION AND MODIFICATION
SH60-B
NAS PAX RIVER,(2000)
Goodrich Aerospace IMDS/HUMS Prototype Install
1 A/C
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the SH60-B.
(On-Time and within budget)
Photobucket



MH53
NAS PAX RIVER, (2000)
1 A/C
Goodrich Aerospace IMDS/HUMS Prototype Install
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on MH53.
(On-Time and within budget)
Photobucket



MH53
MCAS NEW RIVER, (2000-2001)
4 A/C
Goodrich Aerospace IMDS/HUMS Production Install
Photobucket



4 A/C
Goodrich Aerospace IMDS/HUMS Production Install
Provided COntractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on MH53
(On-Time and within budget)



UH60-A
ATTC FORT RUCKER (2001)
2 A/C
Good Aerospace IMDS/HUMS Prototype Install Provided Contractor Field Team and On-Site Management required To install the Goodrich Aerospace Vibraton Diagnostics (IMDS/HUMS) System on UH60-A (On-Time and within budget)
Photobucket



UH-60L
MOSUL, IRAQ (2003-2004)
20 A/C
Goodrich Aerospace IMDS/HUMS Production Install Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnosics (IMDS/HUMS) System on the UH60-L, while embedded with the 101st ID's 9th Battalion, in-country. ATSG was the first contractor to conduct a full installation on active aircraft during an armed conflict. Significantly, the company was able to successfully reduce install time by 10 days. The original 14 day modification was reduced to an aircraft move every four days. The original 14 day modification was reduced to an aircraft move every four days. From contract award, ATSG's team was mobilized and in-theater in only 21 days.
(Ahead of Schedule and within budget)
Photobucket



UH-60L
FORT CAMPBELL, KY (2004)
10 A/C
Goodrich Aerospace IMDS/HUMS Follow-on Effort of Mosul Installs
Provided Contractor Field Team to install the Goodrich Aerospace Vibration Diagnostics (IMDS/HUMS) System on the UH-60L, for the 101st ID's 9th Battalion.
(On-Time and within budget)
Photobucket



Enginerring NASA S-3B Aircraft
Performed at: Boeing Company Jacksonville, Fl (2006-Present)
Contracted to: Boing Logistic Support Service (BLSS)
Note: Perform Engineering and Drafting for NASA S-3B off the shelf systems.
POC: Alan Todoroff 904-317-2459
Contract requires structural engineering and drafting services for NASA S-3B Aircraft at Boeing Logistic Support Services, Jacksonville, Fl.
(On-Time and within budget)
Photobucket